美女色av一区二区三区-亚洲欧洲熟妇自拍偷拍-女同久久国产精品99国产精品-91精品国产丝袜高跟在线

CONTACT

CONTACT:Mr. Xu

+86-13771502818
+86-18762620800
E-mial:xu@wxguode.com Address:Siqian Village, Nanhu Community, Binhu District, Wuxi City

Vacuum diffusion pump operating procedures

1. Check all parts of the vacuum system, familiarize yourself with the gas path structure of the system, understand the functions of the various components of the vacuum system, and the circuit connections of the operating parts.

2. Close the deflation valve, start the mechanical pump, pump the system, and use the spark leak detector to check all parts of the system. In the case of an all-metal system, the valve can be closed and the P-t curve recorded as a vacuum gauge reading (for a static boost test). If the pressure rises linearly with time, it can be concluded that the system has a leak source and should be leak tested.

3. When the system vacuum reaches the pre-pressure of the oil diffusion pump (5×10-2 Torr), start the diffusion pump to gradually increase the heating current to the rated value. Cool water should be turned on before starting the diffusion pump.

4. After the diffusion pump is working normally, use a spark leak detector (or thermocouple meter) to judge the vacuum of the measurement system. An ionization gauge can be used up to 10-3 Torr (a thermocouple is nearly full or 95 squares or more). When using, first degas the regulation, then measure the degree of vacuum.

5. Bake and degas the system. For the glass system, the hard glass baking temperature is 400 ° C ~ 450 ° C, and the soft glass is 350 ° C ~ 400 ° C. Degassing time depends on specific requirements, usually 1 to 2 hours. After the degassing, the vacuum is still not up to the requirement, and the P-t curve should be recorded using the ionization meter to determine whether it is leaking. You can also use the acetone, alcohol, etc. to smear the suspicious place, see the swing of the hands to find the leak. If it is bad for degassing, it should be further baked and degased for a long time. The new system generally takes a long time to reach the desired vacuum. If the vacuum is too old, consider whether the system design, installation is reasonable, whether there is dead space, whether the gas source is more or not, whether the dirt is brought in during maintenance, whether the container is cleaned, and other factors.
2019/05/11 13:52:10 4002 次

Related Documents

Copy right ? 2019 Wuxi Guode Machinery Manufacturing Co., Ltd. Record number: Su ICP No. 19021329
镇坪县| 邵阳县| 古浪县| 古蔺县| 东辽县| 临夏市| 大埔县| 陇西县| 荥经县| 青神县| 罗甸县| 昭平县| 新野县| 科尔| 仙桃市| 云和县| 延边| 扎兰屯市| 饶阳县| 丰镇市| 仙桃市| 金阳县| 开远市| 禄丰县| 南岸区| 东山县| 香河县| 玉溪市| 平潭县| 正蓝旗| 康保县| 上犹县| 昆明市| 抚松县| 巫溪县| 达孜县| 城口县| 霍林郭勒市| 西宁市| 云林县| 台江县|