美女色av一区二区三区-亚洲欧洲熟妇自拍偷拍-女同久久国产精品99国产精品-91精品国产丝袜高跟在线

CONTACT

CONTACT:Mr. Xu

+86-13771502818
+86-18762620800
E-mial:xu@wxguode.com Address:Siqian Village, Nanhu Community, Binhu District, Wuxi City

Vacuum valve installation and application

1. Before the vacuum valve is installed, the pipeline system should be flushed and cleaned to prevent the dirt, such as welding slag and oxide scale, from flowing into the valve, which affects the normal operation of the valve.

2. The vacuum valve should be installed in a place that is easy to operate and repair, and the vertical device is on the horizontal pipeline. It should be noted that the flow direction of the medium in the pipeline is the same as the direction indicated by the arrow on the valve body, and should not be reversed.

3. When the vacuum valve is used in the device, the shut-off valve on the bypass line should be turned over to sweep off the condensed water and steam-water mixture in the pipeline to prevent the water-pressure phenomenon from being damaged when the pressure-reducing valve is opened. After no abnormality, slowly rotate the screw clockwise to adjust the outlet pressure to the required pressure (according to the valve back pressure). After adjustment, lock the lock nut and screw the protective cover.

4. The filter should be installed before the vacuum valve. Do not let the impurities in the medium enter the pressure reducing valve, which will affect its performance.

5. There should be a straight pipe before and after the pressure reducing valve of the device. The length of the straight pipe before the valve is about 600 mm, and the length of the straight pipe behind the valve is about 1000 mm.
2019/05/11 13:45:49 3850 次

Related Documents

Copy right ? 2019 Wuxi Guode Machinery Manufacturing Co., Ltd. Record number: Su ICP No. 19021329
镶黄旗| 宁海县| 仪征市| 依安县| 神农架林区| 龙南县| 凤庆县| 微博| 毕节市| 长海县| 海淀区| 南岸区| 扎囊县| 静乐县| 满城县| 四子王旗| 塘沽区| 南陵县| 重庆市| 海林市| 新余市| 西畴县| 青河县| 新竹市| 淳安县| 安图县| 缙云县| 仙居县| 沿河| 大埔县| 普陀区| 绿春县| 肇源县| 德钦县| 上饶县| 犍为县| 湛江市| 海宁市| 长海县| 红原县| 黑山县|